Urmet Group
B
Log In
 
P

Monthly Archives: October 2014

Load control in IPerHome

When a prefixed power threshold is exceeded, a first relay is cut-off. After some seconds, if the threshold is still exceeded, the second relay is cut-off. And so on.The loads to be cut-off can be connected to relays of different … Continue reading